Skip to content

Commit edb83db

Browse files
committed
updated before you start page
1 parent fe5e2ee commit edb83db

File tree

1 file changed

+6
-50
lines changed

1 file changed

+6
-50
lines changed

overview/before-you-start.md

Lines changed: 6 additions & 50 deletions
Original file line numberDiff line numberDiff line change
@@ -56,54 +56,7 @@ Building a satellite involves complex systems that need careful planning and int
5656
5757
---
5858
59-
With this foundational knowledge, you’ll be better equipped to dive into the satellite-building process. The next step is to select the path that best fits your experience level and start building!
60-
61-
62-
[Get Started]({{site.url}}/get-started){: .btn .btn-purple }
63-
64-
65-
66-
67-
68-
69-
70-
71-
72-
73-
74-
75-
76-
77-
78-
79-
80-
81-
82-
83-
84-
85-
# Before you start
86-
87-
<details markdown="block">
88-
<summary>Table of Contents</summary>
89-
- Table of Contents
90-
{:toc}
91-
</details>
92-
93-
## **1. Introduction**
94-
This document outlines the purpose, structure, and practical steps for using the testing process and procedural guides for subsystems such as the
95-
- On-Board Computer (OBC),
96-
- Electrical Power System (EPS),
97-
- Attitude Determination and Control System (ADCS),
98-
- Communications (COM),
99-
- and the structural components of BIRDS satellites.
100-
101-
### We are creating an environment for sharing knowledge and ideas.
102-
{: .no_toc }
103-
104-
If you would want to contribute to, or work with the [BIRDS] community in order to assist in developing this solution, please contibute to the [our Discussions channel on Github] or [get in touch with us.]
105-
106-
## **2. What are the phases of a satellite?**
59+
## What are the phases of a satellite?
10760
The development and deployment of a satellite involve a series of carefully structured phases to ensure the mission's success. From initial concept discussions to final pre-launch verifications, these phases guide teams through designing, building, and testing the satellite to meet stringent space industry standards.
10861

10962
Each phase acts as a checkpoint to confirm that requirements are met and potential risks are mitigated. Understanding the phases - including the
@@ -112,7 +65,6 @@ If you would want to contribute to, or work with the [BIRDS] community in order
11265
- [Critical Design Review (CDR)], and
11366
- [Flight Readiness Review (FRR)]
11467

115-
11668
```mermaid
11769
gantt
11870
title Satellite Milestones
@@ -163,7 +115,11 @@ These phases create a structured pathway from conceptualization to launch, with
163115
- **Sensing Devices**: Magnetometers, gyroscopes for ADCS
164116
- **Version Control**: Git/ [GitHub]
165117

166-
## [Getting Started]({{site.url}}/get-started){: .btn .btn-purple }
118+
119+
With this foundational knowledge, you’ll be better equipped to dive into the satellite-building process. The next step is to select the path that best fits your experience level and start building!
120+
121+
122+
[Get Started]({{site.url}}/get-started){: .btn .btn-purple }
167123

168124
## Other resources
169125
- [Engineer Me This](https://www.youtube.com/@EngineerMeThis/videos)

0 commit comments

Comments
 (0)